| Artist's rendering of what one solution could look like |
This befuddling section of the SRT has resisted development for years. Finally, however, the possible ways to close the gap are coming into focus. In 2010, Philadelphia Parks and Recreation (PPR) won a federal grant to conduct an engineering study. They hired Michael Baker Jr. Inc to conduct a "preliminary" engineering study of the area. It was the first study since the Schuylkill Project developed a conceptual plan in 2008. A stakeholder committee was established and met three times with the consultants and PPR staff. One public meetings was held on November 1, 2012.
The result was evaluations of three alignment options. In each case, a new bridge crossing over the Wissahickon Creek is required. See the three alignments below:
The result was evaluations of three alignment options. In each case, a new bridge crossing over the Wissahickon Creek is required. See the three alignments below: